Synthetic Grid Generation

tellegen-synth generates a geo-referenced transmission grid for a region drawn on a map, validates it with the engine’s DC optimal power flow and AC power flow, and reports every verdict as the engine returned it. The result is a PowerIO BalancedNetwork module whose buses carry locations and whose branches carry routes, plus a GenerationReport. The crate is part of the one wasm module (feature synth), so the whole pipeline runs in the browser; the CLI runs the same code natively.

The grids are synthetic. Topology, impedances, ratings, loads and generation are modelled from the region’s geography and population with the cited tables below, so a generated grid resembles a transmission system without describing any real one. OpenStreetMap mode maps real substations, lines and plants, but its electrical parameters and loads stay modelled.

Stages

A session runs one bounded stage per call. The calibration stage runs once per iteration.

StageWork
contextparse and measure the region (spherical area, landmasses, island groups, keeping the most populous group when far islands are cut); resolve peak demand from the national demand table, the voltage ladder, the bus count and the fuel mix
site_busesanchor buses on the most populous places, fill the rest with blue noise; allocate demand-weighted loads, holding every bus at or below the top level’s load cap
topologyper island, a minimum spanning tree, a tree over the highest-voltage buses, a Gabriel mesh up to the branch factor, and high-voltage loops, all from one Delaunay triangulation
electrifysite generation; design every corridor; run the corridor plan and the reactive plan; build the PowerIO network
dc_opfthe engine’s DC OPF per island
calibrateone recorded calibration step per call
ac_pfthe engine’s AC power flow per island at the DC OPF dispatch
finalizewrap the network in a module with its producer and history

Every stage up to electrify is O(n log n). The library reads no clock, no filesystem and no platform randomness. Each stage draws from its own ChaCha8 stream seeded from the request seed, so the same request and places table give the same module, byte for byte, natively and in wasm.

Demand and bus count

  • National demand. By default each country’s peak is its annual demand from Ember’s Yearly Electricity Data (via Our World in Data’s energy dataset, CC BY 4.0) as an average load, times a peak factor of 1.3. The table is crates/tellegen-synth/data/national_demand.json, derived by scripts/derive-national-demand.py from owid-energy-data.csv; 196 of 212 countries report 2024. A place whose country has no entry draws the world average per person and raises demand_fallback. demand.per_capita_kw sets one average per person for every place instead, and a total_mw demand states the total.

  • Listed and unlisted demand. The places table lists a country’s cities, not all of its people: from 5% of Ethiopia’s population to 72% of Japan’s. So a country’s peak splits in two:

    • The share its listed places explain (their population over the national population, listed_share) follows those places, by population.
    • The unlisted rest is spread over the country’s area. A region takes it in proportion to the country area it covers (area_share; each part of the region counts to the country of its nearest place), but never beyond its share of the country’s listed population, since a drawn box may be sea or desert; covering 95% of the area takes all of it.

    A region covering a whole country reproduces its national peak. A box holding a country’s few listed places takes only the part of the country it covers. Leaving far islands out removes their places, and with them their share by population, not by area. Country areas come from Natural Earth’s 1:50m admin-0 polygons, measured with the generator’s own spherical area (data/country_areas.json, derived by scripts/derive-country-areas.py). The report lists the countries behind the demand with these shares (context.demand_by_country), and both tables’ hashes (provenance.demand_table).

  • Peak factor. Annual load factors run from 0.58 to 0.77 in the systems surveyed (OCCTO, ENTSO-E, PJM, ERCOT, NEA, India’s Ministry of Power), a peak factor of 1.3 to 1.72. Ember’s demand counts losses and self-supplied use that operators’ peak series leave out, so the factor applied to it is the low end, 1.3. It is a modelling choice within that range.

  • Places at the coast. Generalised country outlines leave out harbours and estuaries: at 1:50m, New York lies 1.9 km outside the United States and Lisbon 1.6 km outside Portugal. A place up to 15 km outside the region joins it, moved onto its edge, when the region holds at least half of that country’s place population counting such places (context.places_snapped). A drawn box around one city never snaps the cities beyond its edges.

  • Bus count. Without target_bus_count, the count follows the region’s area and density and is then moved into the range that keeps peak load per bus between 30 and 150 MW. Those are the scales of transmission models down to 110–220 kV (PEGASE, RTE) and of substation-level models at 220 kV and above (PyPSA-Eur, SciGRID). limits.max_bus_count (3000) still caps it, and bus_count_capped says by how much.

  • Load cap. No bus carries more than the load cap of the highest modelled level (7 GW at 500 kV, 2.9 GW at 400 kV). The excess of a metropolitan bus moves to the nearest buses of its island with room, and buses_load_capped and load_spilled_mw count it.

Voltage levels

  • National ladders. A request that names no voltage_levels_kv (the default) is modelled at the AC transmission levels of its region’s dominant country by demand, from data/voltage_ladders.json, a table of national ladders with their sources: for example 380/220 kV in Germany, 400/275 kV in Great Britain, 500/345/230 kV in the United States and 500/275 kV in Japan. context.voltage_basis says country, context.voltage_country names the country, and provenance.voltage_table gives the table’s version and hash.
  • Higher levels. The table also lists any higher AC level a country has in service: 765 kV in the United States, India, Brazil and South Africa, 750 kV in Russia, 1000 kV in China and 500 kV in eastern Australia (context.promotion_levels_kv). Only these may be added above the ladder by the corridor plan. A country with none, such as Germany, France, Great Britain, Spain, Portugal or Japan, keeps its ceiling: a corridor short of capacity at four circuits stays capped and the plan reports planning_incomplete.
  • Fallback. A country without an entry takes the ENTSO-E members’ 400/220 kV when it is a member, else IEC 60038’s standard 400/220 kV, with no higher level, and raises voltage_fallback (context.voltage_basis fallback).
  • Stated levels. A request that names its levels is modelled at them, and the plan may add 765 kV above them, as before (voltage_basis request).
  • Line parameters. A level between the line classes takes the nearest class’s conductors at its own voltage (below), so 380 and 400 kV use the 345 kV class scaled by 1.10 and 1.16, and 1000 kV the 765 kV class scaled by 1.31.

Parameters

Every constant lives in crates/tellegen-synth/src/electrical/params.rs with a source: comment, apart from the demand and siting constants, which sit beside the code that uses them.

Line classes. Representative ACSR bundles from Glover, Overbye and Sarma, Power System Analysis and Design; SIL from Kundur, Power System Stability and Control, Table 6.1:

Class kVr Ω/kmx Ω/kmb µS/kmthermal MVASIL MW
1380.110.483.418050
2300.060.453.8500140
3450.030.354.81200400
5000.020.305.62500900
7650.0120.266.545002200
  • Voltage levels between classes. A requested level such as 220 kV or 34.5 kV takes the nearest class’s conductors at its own voltage. Its thermal rating scales with the voltage (same ampacity, S = √3 V I), and its SIL with the square (same surge impedance, SIL = V² / Zc).
  • Ratings. A line’s rating is the lesser of its thermal rating and SIL times the St. Clair loadability. The loadability curve follows Dunlop, Gutman and Marchenko (1979): 3.0 SIL up to 80 km, 1.0 at 480 km. A rating is never raised above what the conductor and length allow.
  • Transformers. Impedance follows the size class: 8, 10 or 12% on the unit’s own base, after IEEE C57.12.10 and Grainger and Stevenson. Banks are sized for the larger of local load and local generation, with 20% headroom. Buses sit at their own base kV, so the off-nominal tap is 1.0; the winding ratio is recorded in the branch extras.
  • Generation. Fuel unit sizes and costs come from EIA-860 and the EIA Electric Power Monthly. Installed capacity is (1 + reserve margin) × peak load, with an 18% default margin. No bus collects more generation than its class can evacuate: 400 MW at 115–161 kV, 1.2 GW at 230 kV, 2.7 GW at 345 kV and 4 GW at 500 kV, following the interconnection voltages of the largest U.S. plants.
  • Regional adequacy. An island’s units are grouped into adequacy areas of about 10 GW of the load nearest them, the scale of the Lower 48’s 66 balancing authorities. Each area holds the reserve-margin capacity of its own load, shared among its units by their drawn sizes, so the network carries balancing transfers between neighbours rather than one side of a country’s demand to the other. A share above a bus cap spills onto the area’s other units, then onto the area’s next ranked bus.

Planning before validation

A generated grid is planned so that it is feasible by construction, not repaired after a solver refuses it. No number in a report is adjusted after a solve.

  • Planning case. The planning case is peak load under the least-cost dispatch of the generators (equal incremental cost) on a lossless DC power flow: the grounded Laplacian, solved by Jacobi-preconditioned conjugate gradients.
  • Voltage class by power and distance. A corridor that would need more than two circuits at its voltage raises its ends to the next level. Above the highest modelled level the plan may add only a higher level in service (added_level_kv, warning voltage_level_added).
  • Circuit cap. A corridor holds at most four circuits: double and quadruple circuit lines are common in Germany, India, Japan and China, and in the OpenStreetMap-based European grid no line at 220 kV and above carries more than four per voltage level. A corridor that would need more raises its ends instead. One that still needs more at the highest level available is counted in capped_corridors and reported.
  • Capacity. Circuits are added until no circuit runs above 90% of its rating in the planning case; this is Garver’s flow-driven expansion under the NERC TPL-001 base-case requirement. A transformer corridor first takes a larger bank, up to the rating of its line.
  • Stability margin. Each line within its own St. Clair rating can still add up to too wide an angle along a chain. So the plan aims to hold every island’s angle spread to asin(0.7) ≈ 44.4°, the St. Clair curve’s 30% steady-state margin, reinforcing the corridors a first-order spread sensitivity ranks highest. It raises buses within the requested levels until 35% of them sit at the highest one, and only then onto 765 kV. It adds circuits only up to 1.6 branches per bus, about a tenth above the densest North American systems (1.2–1.5, Birchfield et al. 2017). The last quarter of the planning rounds only adds capacity. A spread still too wide is reported as planning_incomplete, not met by a network denser than real ones.
  • Branch factor. Circuits the requested branch factor still leaves go where the planned loading is heaviest. The plan exceeds the factor only when capacity or the margin needs more, and then raises the branch_target_exceeded warning.
  • Reactive plan. The reactive plan holds a flat profile at the generator set point (1.02 pu). It solves the AC active-power equations for the angles at the planning dispatch (fast decoupled P–θ, Stott and Alsaç 1974), then installs a capacitor bank or a shunt reactor wherever a bus needs more reactive power than half its machines’ capability provides. Reactive power does not travel far (Kundur §11.2), so it is supplied where it is used. This plan covers line charging, series absorption and the share resistance moves to the receiving end.
  • Voltage support. A loaded bus farther than 480 km of corridor from any generator gets a synchronous condenser, farthest first: no active power, and a reactive range of 0.5 MVAr per MW of the load nearest it. 480 km is where the St. Clair curve falls to 1.0 SIL and voltage-drop and stability limits replace the thermal one. Without one, a remote pocket fed over long lines has nothing to hold its voltage, and its AC power flow can stall while the lines are well inside their ratings. Condensers are flagged in the generator annotations (condenser) and counted in the electrify stage (condensers); a mapped OSM network gets none.

The plan is recorded in GenerationReport.planning: rounds, promoted buses, the added level, the most circuits on one corridor (max_parallel_circuits) against the cap (circuit_cap), capped corridors, capacity, stiffening and filler circuits, enlarged banks, angle spread, and banks and MVAr installed. Each circuit is its own branch row; its annotation in GenerationReport.elements gives the corridor’s circuit count (circuits) and the branch’s 1-based place among them (circuit_index).

Validation and calibration

  • Islands. The DC OPF and the AC power flow run per electrical island, each with its own reference bus.
  • HVDC. Links are replaced by fixed transfers on a validation copy, because the engine’s models do not read HVDC rows.
  • Failures. An infeasible DC OPF is reported as infeasible with the engine’s message; nothing is shed. Load shedding is off in the portable DC OPF, so unserved energy is 0 when optimal and absent otherwise. An AC power flow that does not converge is reported as such.
  • Calibration. Calibration is a recorded search over declared parameters against a declared objective:
    • parameters: rating scale per class and capacity scale per fuel within [0.8, 1.5], rating notches on binding branches, and load scale only on request;
    • objective: DC infeasibility, worst loading above target, under-utilisation, binding fraction, reserve margin, plus the structural terms the parameters cannot move.
  • Calibration steps. Every candidate is an exact DC OPF re-solve; a step that does not improve the objective is rejected and undone. The status says Unchanged when nothing improved, and the final objective is the measured one.

OpenStreetMap mode

With source: "osm" and an Overpass document (one, or the two halves of an antimeridian-crossing region), the grid is built as follows:

  1. Substation sites within 500 m cluster, and each voltage level at or above 110 kV gets a bus, with a transformer between consecutive levels.
  2. Fragmented ways stitch where exactly two ends meet away from a station.
  3. Untagged voltages are inferred from the endpoints, and line ends snap to the bus of their voltage within 2 km. Parallel ways aggregate into one corridor.
  4. DC ways between converters become HVDC rows.
  5. Plants snap within 10 km; makeup units cover a shortfall against the reserve margin.
  6. The island policy applies: connect (default), cut or keep.

Mapped circuits are real, so the corridor plan only measures them; the reactive plan still applies. A network too thin to use is the typed osm_insufficient refusal. The caller decides whether to rerun synthetically; the generator never switches on its own. The Overpass QL comes from the engine (syntheticOverpassQueries), so its text exists once.

Using it

In the browser (@tellegen/engine):

import { createSynthSession } from "@tellegen/engine";

const session = await createSynthSession({ region: { geometry, label: "Portugal" } });
const report = await session.run((step, preview) => {
  // step.stage, step.progress; preview holds typed arrays for binary map layers
});
const moduleJson = await session.takeModule(); // pio-ir with Bus.location and Branch.route
const ingest = await session.ingest();         // the drop payload of that module
session.free();
  • Host. Sessions run on a dedicated worker (synthEngineHost()). Cancelling one terminates only that worker, so interactive studies are untouched.
  • Places table. The Natural Earth table (public domain) ships in the package and loads once per worker. The national demand table is compiled into the module.
  • Types. Request and report types are generated from Rust under @tellegen/engine/synth.
  • Coordinates. The ingest payload has coords_kind: "synthetic" and coords_method: "generated": the buses are sites chosen on real geography, not a topology layout, and the case panel says so.

From the command line:

tellegen generate --request request.json --out run/ --export matpower,psse35 --gridfm
tellegen stats --case case.m          # or a PowerIO module on stdin

Exports go through the engine’s Study.export: MATPOWER, PSS/E (v33, v34, v35, RAWX), PowerWorld, PSLF, PowerModels JSON, pandapower JSON and the IIDM formats. The GridFM graphkit JSON writer belongs to tellegen-synth, because PowerIO’s gridfm format is the Parquet dataset layout.

Limits

  • Requests are capped at 3000 buses, which the automatic count reaches for the largest countries. China at 3000 buses takes about 1.0–1.2 s natively and 1.5 s in wasm (Node, Apple M5 Pro), end to end with both validations; the United States takes 1.4–1.5 s and 2.0 s, about 0.9 s of it an AC power flow that does not converge over five starts. A 500-bus country takes under 0.1 s. evidence/synth records the measurements.
  • Whether the AC power flow converges inside the band depends on the seed for several countries. evidence/synth sweeps three seeds on two outlines (Natural Earth 1:50m and the MapToGrid app’s 1:110m layer): 91% and 92% of the runs pass AC, every run passes DC, and the United States fails at every seed.
  • Clustering in generated grids runs higher than in the ACTIVSg200 and GOC500 references, because the Gabriel mesh is rich in triangles. Their highest nodal degree is also lower, since the mesh caps it at 8. evidence/synth measures both against the references.
  • Continental regions span several thousand kilometres as one AC island. Their planning-case angle spread stays well above 44° within the branch budget, so the plan reports planning_incomplete. Real systems of that size split into synchronous areas joined by HVDC, which the generator does not model yet; very long corridors, such as across the Nullarbor or between Indonesian islands, stay AC.
  • The engine’s AC power flow starts from a flat profile. On long, weakly coupled systems it can fail to converge, or settle on a second solution outside the voltage band, even when the planned operating point is valid. A warm start from the stored case state, once the engine offers it, removes this.